Annual consumption follows from target IT load, operating time and PUE.
Tool for integrators and designers
Coolnet Data Center Planner.
Estimate UPS capacity, cooling, utility connection, energy, annual cost and redundancy. Review transparent assumptions and prepare a concept report for the next design discussion.
Concept result
Infrastructure parameters
Values update automatically.
Architecture comparison
Baseline, N+1 and 2N
The comparison shows the impact of redundancy on installed capacity. N+1 uses a conceptual 25% allowance; the final module count depends on the selected equipment range.
| Option | UPS | Cooling | Connection |
|---|---|---|---|
| N | – | – | – |
| N+1 | – | – | – |
| 2N | – | – | – |
The address is not sent or stored. It is written only into the locally generated report.
Transparent methodology
See where every result comes from.
This is a pre-design analysis. It shows infrastructure scale and prepares the information needed for selection, but it does not replace a heat balance, electrical design, or manufacturer selection sheets.
All electrical energy consumed by IT becomes heat. The technology factor adds a system allowance.
N has no reserve, N+1 uses a conceptual modular allowance, and 2N provides two complete paths.
Requires an equipment list, load profile, room conditions and agreed availability target.
Verify the calculation
Move from concept to a specific architecture.
Send the report and basic site information. We will verify the assumptions required to select power, cooling and modular infrastructure.