Tool for integrators and designers

Coolnet Data Center Planner.

Estimate UPS capacity, cooling, utility connection, energy, annual cost and redundancy. Review transparent assumptions and prepare a concept report for the next design discussion.

Full results without a formNo contact details are required to see the calculation. The optional email address is used only as a label in the locally generated report.

Project data

Define the load

Start with four values. Designer mode provides technical parameters.

Quick mode: six essential inputs and an immediate concept result.

kW
kW
racks
%
h
days

Concept result

Infrastructure parameters

Values update automatically.

UPS incl. redundancy
Required cooling capacity
Design connection capacity
Assumption: design IT load = greater of current/target load × reserve. UPS includes power factor and selected redundancy. Cooling includes IT load, technology allowance and redundancy.
Annual energyIT load × PUE × operating time
Annual energy costenergy × kWh price
Indicative PUEfacility power / IT power
Power density
Heat rejection1 kW = 3.412 kBTU/h
Battery energyestimate at 90% efficiency
Indicative solution class

Architecture comparison

Baseline, N+1 and 2N

The comparison shows the impact of redundancy on installed capacity. N+1 uses a conceptual 25% allowance; the final module count depends on the selected equipment range.

OptionUPSCoolingConnection
N
N+1
2N

The address is not sent or stored. It is written only into the locally generated report.

Transparent methodology

See where every result comes from.

This is a pre-design analysis. It shows infrastructure scale and prepares the information needed for selection, but it does not replace a heat balance, electrical design, or manufacturer selection sheets.

Power and energy

Annual consumption follows from target IT load, operating time and PUE.

Cooling

All electrical energy consumed by IT becomes heat. The technology factor adds a system allowance.

Redundancy

N has no reserve, N+1 uses a conceptual modular allowance, and 2N provides two complete paths.

Final selection

Requires an equipment list, load profile, room conditions and agreed availability target.

Verify the calculation

Move from concept to a specific architecture.

Send the report and basic site information. We will verify the assumptions required to select power, cooling and modular infrastructure.